欧美乱妇无码毛片斯巴达三百勇士,西西444www无码大胆,97精品超碰一区二区三区 ,在线免播放器高清观看

濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請(qǐng)關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機(jī): 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.za6322222.com/

地址:山東省濟(jì)南市章丘圣井工業(yè)園

濟(jì)南木工加工棚:現(xiàn)場防護(hù)棚應(yīng)該怎么做?去現(xiàn)場看看做對(duì)了沒

來源:http://www.za6322222.com/   發(fā)布時(shí)間:2024-09-15

  一般規(guī)定

  general provisions

  1.防護(hù)棚框架體系采用型鋼材料,型材具體規(guī)格應(yīng)根據(jù)荷載進(jìn)行核算,編制專項(xiàng)方案。

  1. The protective shed frame system adopts steel materials, and the specific specifications of the profiles should be calculated according to the load, and a special plan should be prepared.220543198043643974

  2.防護(hù)棚頂棚上層有防雨措施,并設(shè)不小于5%坡度的排水坡。非防砸范圍可使用單層頂棚。處于高空墜物半徑內(nèi)或處于起重機(jī)臂桿回轉(zhuǎn)范圍之內(nèi)時(shí),頂棚需采用雙層硬防護(hù),高度應(yīng)為700mm,硬質(zhì)防護(hù)應(yīng)采用厚度不小于50mm木板等材料。3.防護(hù)棚頂部采用戶外車貼形式粘貼標(biāo)語、標(biāo)識(shí),標(biāo)語為藍(lán)底白字,上、下弦張貼50mm~100mm寬紅白警示帶。

  2. The upper layer of the protective shed ceiling is equipped with rainproof measures and a drainage slope with a slope of not less than 5% is set up. A single-layer ceiling can be used in non smash resistant areas. When within the radius of falling objects from high altitude or within the range of crane arm rotation, the ceiling should be protected with double-layer hard protection, with a height of 700mm. The hard protection should be made of materials such as wooden boards with a thickness of not less than 50mm. 3. The top of the protective shed adopts outdoor car stickers to paste safety slogans and signs. The slogans are blue with white letters, and red and white warning tapes with a width of 50mm~100mm are posted on the upper and lower strings.

  02配電箱防護(hù)棚

  02 Distribution box protective shed

  1.總配電箱、固定式分配電箱需設(shè)置防護(hù)棚,穩(wěn)固安置在混凝土承臺(tái)上。2.電箱防護(hù)圍欄主框架不小于40mm×40mm×2.5mm方管,柵欄不小于20mm ×20mm×2mm方管 3.配電箱操作面鋪設(shè)絕緣踏板或膠墊。4.防護(hù)圍欄正面懸掛操作規(guī)程、責(zé)任標(biāo)識(shí)牌、警示標(biāo)志等,外側(cè)配備消防器材。5.圍欄的長寬可根據(jù)實(shí)際需要進(jìn)行調(diào)整。

  1. The main distribution box and fixed distribution box need to be equipped with protective sheds and securely placed on concrete platforms. 2. The main frame of the protective fence for the electrical box shall not be less than 40mm x 40mm x 2.5mm square tube, and the fence shall not be less than 20mm x 20mm x 2mm square tube. 3. Insulation pedals or rubber pads shall be laid on the operating surface of the distribution box. 4. Hang operating procedures, responsibility signs, warning signs, etc. on the front of the protective fence, and equip fire-fighting equipment on the outside. The length and width of the fence can be adjusted according to actual needs.

  1.防護(hù)棚采用工字鋼方管等型材加工,組合式連接,架體結(jié)構(gòu)應(yīng)滿足要求。各種型材及構(gòu)配件具體規(guī)格應(yīng)根據(jù)當(dāng)?shù)仫L(fēng)荷載、雪荷載進(jìn)行核算,編制專項(xiàng)方案。如遇臺(tái)風(fēng)應(yīng)采取防風(fēng)措施,可設(shè)置纜風(fēng)繩。2.防護(hù)棚頂部正面設(shè)置企業(yè)標(biāo)識(shí)、“鋼筋加工棚”、警示標(biāo)志,其余各面設(shè)宣傳標(biāo)語。內(nèi)部懸掛操作規(guī)程。3.頂棚底部距地面高度不低于3000mm。頂棚鋪設(shè)防砸、防雨雙層防護(hù)。立柱宜采用不低于150mm×150mm×3mm 方管;橫撐及斜撐為100mm×50mm×2.5mm 方管;桁架主梁采用100mm×100m×2.5mm方管;主梁上部以80mm×40mm×2.5mm 方管搭設(shè)龍骨。4.各節(jié)點(diǎn)連接的兩端可接不低于10mm厚的鋼板,以M12的螺栓連接,方便拆卸周轉(zhuǎn)使用。5.立柱基礎(chǔ)澆筑700mm×70mm×700mm混凝土,預(yù)埋300mm×300mm ×12mm鋼板。???裝配式防護(hù)棚節(jié)點(diǎn)連接鋼筋加工棚立柱底板示意?04

  1. The protective shed is processed with profiles such as I-beams and square tubes, and connected in a combination. The frame structure should meet safety requirements. The specific specifications of various profiles and components should be calculated based on local wind and snow loads, and a special plan should be prepared. In case of a typhoon, windproof measures should be taken, and cable wind ropes can be installed. 2. The front of the top of the protective shed shall be equipped with the enterprise logo, "Steel Processing Shed", warning signs, and safety propaganda slogans on all other sides. Internal hanging safety operating procedures. 3. The height from the bottom of the ceiling to the ground shall not be less than 3000mm. The ceiling is equipped with double layered protection against smashing and rain. Column should be made of square tube not less than 150mm × 150mm × 3mm; The cross brace and slant support are 100mm × 50mm × 2.5mm square tubes; The main beam of the truss adopts 100mm × 100m × 2.5mm square tubes; A keel is erected on the upper part of the main beam using 80mm × 40mm × 2.5mm square tubes. 4. Both ends of each node connection can be connected to steel plates with a thickness of no less than 10mm, and connected with M12 bolts for easy disassembly and turnover. 5. Pour 700mm × 70mm × 700mm concrete into the column foundation, and embed 300mm × 300mm × 12mm steel plates.??? What is the schematic diagram of the connection between the nodes of the prefabricated protective shed and the bottom plate of the steel processing shed column? 04

  1.木工加工棚凈空高度不低于3000mm,結(jié)構(gòu)形式類似鋼筋加工防護(hù)棚,立柱與地面連接牢靠。2.地面需硬化,防護(hù)棚內(nèi)宜增設(shè)防塵降噪措施,配備滅火器材,驗(yàn)收牌、警示牌等圖牌。??05

  1. The clearance height of the woodworking processing shed shall not be less than 3000mm, and the structural form shall be similar to that of a steel reinforcement processing protective shed. The columns shall be firmly connected to the ground. 2. The ground needs to be hardened, and dust and noise reduction measures should be added to the protective shed. Firefighting equipment, inspection signs, warning signs, and other signs should be equipped.?? 05

  1.施工現(xiàn)場未集中使用的中小型機(jī)械應(yīng)設(shè)置單體防護(hù)棚。2.防護(hù)棚采用工字鋼、方鋼等型材加工,同鋼筋棚加工方式,可組合式連接,架體結(jié)構(gòu)應(yīng)滿足要求。單體防護(hù)棚基礎(chǔ)施工應(yīng)經(jīng)設(shè)計(jì)計(jì)算確定,底部與基礎(chǔ)采用膨脹螺栓固定。

  Small and medium-sized machinery that is not centrally used on the construction site should be equipped with individual protective sheds. 2. The protective shed is made of profiles such as I-beams and square steel, and can be connected in combination with the steel reinforcement shed processing method. The frame structure should meet safety requirements. The construction of a single protective shed foundation should be determined through design calculations, and the bottom and foundation should be fixed with expansion bolts.

  本文由 木工加工棚  友情奉獻(xiàn).更多有關(guān)的知識(shí)請(qǐng)點(diǎn)擊   http://www.za6322222.com  真誠的態(tài)度.為您提供為的服務(wù).更多有關(guān)的知識(shí)我們將會(huì)陸續(xù)向大家奉獻(xiàn).敬請(qǐng)期待.

  This article is a friendly contribution from the woodworking processing shed. For more related knowledge, please click http://www.za6322222.com Sincere attitude. We provide you with comprehensive services. We will gradually contribute more relevant knowledge to everyone. Please stay tuned

偷拍真实夫妇作爱视频| 黑加白blackedhd| 亚洲成a人片在线观看| 工口里番h本之侵犯全彩在线| 东北大坑原始欲续全文下载| 杨门女将之浪荡合集| 成人免费区一区二区三区| 日日躁夜夜躁狠狠躁| 亚洲av无码乱码国产精品久久| 强壮公次次弄得我好爽a片| 粗大的内捧猛烈进出在线视频| 999热线在线观看| 大学生第一次破女处a片| 白天躁晚上躁天天躁2022| 天天做夜夜躁狠狠躁视频| 免费影视观看网站入口| 国产spa盗摄xo在线观看| 久久久久成人精品免费播放动漫| 亚洲中文字幕在线| 白嫩白嫩bbwbbwbbw| 野花视频在线观看免费| 天天躁日日躁狠狠躁欧美老妇小说| 人禽无码视频在线观看| 12末发育娇小性色xxxx| 极品老师腿张开粉嫩小泬| 欧美精品一区二区少妇免费a片 | 99久久国产露脸国语对白| 将军与娇妻各种做高h| 欧美学生小嫩嫩xb| 性xxxx欧美孕妇奶水| jizz国产精品| 性生生活大片又黄又| 无套和妇女做内谢| 亚洲色大成网站www| 一起碰一起噜一起| 性xxxxfreexxxxxvideo| 按摩师舌头进去添的我好舒服| 好想被狂躁a片免费久99| 国产精品日韩欧美一区二区三区 | 999久久久免费精品国产 | 人妻精品久久久久中文字幕一冢本|