欧美乱妇无码毛片斯巴达三百勇士,西西444www无码大胆,97精品超碰一区二区三区 ,在线免播放器高清观看

濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機(jī): 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.za6322222.com/

地址:山東省濟(jì)南市章丘圣井工業(yè)園

當(dāng)前位置: 首頁 > 新聞中心 > 常見問題

在加工棚拆除前須進(jìn)行技術(shù)交底!

來源:http://www.za6322222.com/   發(fā)布時(shí)間:2023-02-20

在施工過程中搭建木工加工棚一定要注意做好防護(hù)措施,施工人員一定要按照施工要求進(jìn)行施工。露天的攪拌機(jī)位置,現(xiàn)場混凝土攪拌機(jī)、卷揚(yáng)機(jī)棚、鋼筋棚、木工棚以及一些出入口,現(xiàn)場廁所需要等都需要搭設(shè)木工加工棚。由于建筑使用的木工加工棚增多,使得很多廠家都可以制作木工加工棚。
During the construction process, when building the woodworking processing shed, attention must be paid to the safety protection measures, and the construction personnel must carry out the construction according to the construction requirements. The location of outdoor mixer, on-site concrete mixer, winch shed, reinforcement shed, woodworking shed and some entrances and exits, as well as the need for on-site toilets, all need to set up woodworking processing shed. Due to the increase of woodworking sheds used in buildings, many manufacturers can make woodworking sheds.
木工加工棚在建筑工地上是保護(hù)建筑施工材料的堆放、為了防止工地物品不受雨水淋濕導(dǎo)致生銹。 木工加工棚搭設(shè)完畢后,須經(jīng)過專職員驗(yàn)收合格,方可投入使用。在加工棚搭設(shè)和拆除前,須進(jìn)行技術(shù)交底。
The carpentry processing shed is used to protect the stacking of construction materials on the construction site, and to prevent the rusting of site items from being soaked by rain. After the carpentry processing shed is erected, it can only be put into use after passing the acceptance of the full-time safety officer. Before the erection and removal of the processing shed, safety technical disclosure must be carried out.
高處作業(yè)人員須經(jīng)過技術(shù)培訓(xùn)及考試合格,持證上崗。木工加工棚采用的鋼管、扣件等材料須符合技術(shù)規(guī)范及有關(guān)標(biāo)準(zhǔn)要求。搭設(shè)和拆除水平木工加工棚時(shí),操作工人的“三寶”須齊備,且應(yīng)正確使用。
High-altitude operators must receive professional technical training and pass the professional examination, and work with certificates. The steel pipes, fasteners and other materials used in the woodworking shed must meet the requirements of safety technical specifications and relevant standards. When erecting and dismantling the horizontal woodworking processing shed, the operators' "three treasures of safety" must be complete and used correctly.
木工加工棚
在木工加工棚搭拆時(shí),應(yīng)避免上下同時(shí)作業(yè),把操作時(shí)間錯(cuò)開。搭拆木工加工棚時(shí),所有材料、工具應(yīng)堆放在建筑物外邊線以內(nèi)少2m,堆碼高度不超過1m。拆除的材料須傳遞到樓層內(nèi)并及時(shí)運(yùn)走,嚴(yán)禁高空拋擲。搭拆木工加工棚時(shí),應(yīng)在地面設(shè)置警戒區(qū),并派專人監(jiān)護(hù)。
When erecting and dismantling the woodworking shed, it is necessary to avoid working up and down at the same time and stagger the operation time. When erecting and dismantling the woodworking processing shed, all materials and tools shall be stacked at least 2m within the outer boundary of the building, and the stacking height shall not exceed 1m. The removed materials must be transferred to the floor and transported away in time. Throwing from high altitude is strictly prohibited. When erecting and dismantling the woodworking processing shed, a warning area should be set on the ground and a special person should be assigned to monitor it.
木工加工棚搭拆時(shí),要有專人指揮。管理人員要做到:眼勤、腿勤、嘴勤,對(duì)危險(xiǎn)情況要積極采取有效防護(hù)措施,確保人員。雨天、大風(fēng)天氣,暫停木工加工棚搭拆施工,并應(yīng)檢查維護(hù)木工加工棚的。
When erecting and dismantling the woodworking shed, a special person shall be assigned to command. The management personnel shall be diligent in eyes, legs and mouth, and actively take effective safety protection measures for dangerous situations to ensure personnel safety. In rainy and windy weather, the erection and dismantling of woodworking processing shed shall be suspended, and the safety of woodworking processing shed shall be checked and maintained.
在施工過程中搭建木工加工棚一定要注意做好防護(hù)措施,施工人員一定要按照施工要求進(jìn)行施工。露天的攪拌機(jī)位置,現(xiàn)場混凝土攪拌機(jī)、卷揚(yáng)機(jī)棚、鋼筋棚、木工棚以及一些出入口,現(xiàn)場廁所需要等都需要搭設(shè)木工加工棚。您有需求就來我們網(wǎng)站http://www.za6322222.com咨詢吧!
During the construction process, when building the woodworking processing shed, attention must be paid to the safety protection measures, and the construction personnel must carry out the construction according to the construction requirements. The location of outdoor mixer, on-site concrete mixer, winch shed, reinforcement shed, woodworking shed and some entrances and exits, as well as the need for on-site toilets, all need to set up woodworking processing shed. Come to our website if you need http://www.za6322222.com Ask!

欧洲aaaaa特级毛片| 成色au999| 麻花传媒剧国产mv网站| 国产美女精品一区二区三区| 老太bbw搡bbbb搡bbbb| 国产香蕉97碰碰久久人人 | 欧美zc0o人与善交| 国产无套内射普通话对白| youjizz丰满熟妇中国| 无限看片的视频高清在线| 国产香蕉尹人视频在线| 中文在线资源天堂www| 挺进同学熟妇的身体| 国产在线| 国产+高潮+白浆| 故意穿暴露被强好爽h漫画| 亲嘴脱内衣内裤摸屁股| 露小内裤奶头白丝jk水手维特| 白洁少妇高义全文阅读| 糖心vlog官网| 国产无遮挡无码视频免费软件| 天干天干天夜夜爽啪啪免费网站| 一区二区三区| 特黄aaaaaaa片免费视频| 学生娇小嫩白紧小疼叫| 国产女主播喷水视频在线观看| 经典肥岳短篇系列小说推荐| 男女做爰猛烈叫床视频动态图| 暴虐sm灌浣肠调教| 久久精品国产亚洲av无码麻豆| 国产又粗又猛又爽又黄| 超级yin荡的高中女学生h| 熟妇人妻中文字幕| 亚洲av色香蕉一区二区三区| 日本a级作爱片| 精灵世界的底层训练家| 国精产品一区二区三区有限公司| 成人片黄网站a毛片免费| 美少年高潮h跪趴扩张调教喷水| 东北熟女bbwbbw喷水| 40岁成熟女人牲交片20分钟|